Demolition & cleanup

Remove what is damaged.Prepare to rebuild.

TNT provides controlled demolition, debris removal, affected-material removal, and cleanup to prepare damaged spaces for restoration and reconstruction.

Request Service
TNT Restoration technician inspecting fire and smoke damage

Selective demolition with the next phase in mind.

Restoration demolition is different from simply tearing things out. The goal is to remove what cannot remain, protect what can be saved, keep the work area organized, and leave the property ready for the repair team.

Selective demolition

Removal of damaged drywall, flooring, trim, cabinets, insulation, and other affected materials where appropriate.

Debris & cleanup

Organized removal of construction debris and damaged materials to improve safety and prepare for rebuild work.

Restoration preparation

Open affected areas when needed so drying, inspection, remediation, or reconstruction can proceed.

Jobsite control

Maintain a practical work zone with attention to surrounding finished areas and the next construction stage.

Cleanup and damage assessment in progress.

Fire damage kitchen inspection

Fire damage assessment

Inspection and planning before selective demolition and reconstruction.

Controlled work-area containment setup

Controlled cleanup

Controlled cleanup and affected-material removal, with regulated mold work performed by appropriately licensed professionals when required.

When demolition becomes part of restoration.

Water damage

Wet or deteriorated materials may need to be removed before the structure can dry and be rebuilt.

Fire & smoke

Charred, heat-damaged, or heavily contaminated materials may require controlled removal.

Mold-related work

Affected porous materials may need to be removed within a controlled remediation setup.

Ready for the cleanup phase?

TNT can help remove damaged materials and prepare the property for rebuilding.

Request Service